Last updated 2/7/11
Amount Still Needed for Phase #1: $220,000
Total Cost for Phase #1: $1,800,000
The first phase is underway to build a permanent, well-equipped, God-honoring campus for La Molina Christian Schools (LMCS)– a bilingual school established in 1997. The LMCS New Campus will be constructed on a site already owned by the school. The building consists of three wings situated in the shape of a “u”. The two educational wings are two stories above ground and one below which is considered a “walk-out” basement that leads to the outdoor recreational facilities. The other wing houses the administrative offices.
The project has a 42,000 square foot building that includes:
- Classrooms for over 350 students
- Library
- Science lab
- Computer lab
- Multi-purpose room/chapel
- Large cafeteria/auditorium/gym situated in the middle of the “u”
- Kitchen
- Teacher’s workrooms
- Counseling rooms
- Restrooms/changing rooms
- Offices
- Storage
- Handicap/service elevator
- Water cistern/engine room
The campus also includes:
- Large playground
- Two multipurpose courts
- One grass field
- Cogeneration plant (under clock tower)
- Drop-off lane
- Parking lot
- Landscaping
– all enclosed by a 10-foot perimeter wall.